Tamilnaduटेक्नोलॉजीटॉप न्यूज़देश
Trending

AP CM Naidu Announces Soon-to-Launch Bullet Train Corridor Linking Hyderabad, Amaravati, Chennai & Bengaluru

Chief Minister N. Chandrababu Naidu reveals plans for a high-speed bullet train network across South India, covering four major cities and serving over 5 crore people.

CM Naidu Unveils South India Bullet Train Vision

At the India Food Manufacturing Summit in Visakhapatnam, Andhra Pradesh CM N. Chandrababu Naidu revealed that bullet train connectivity will soon link Hyderabad, Amaravati, Chennai, and Bengaluru, targeting a combined population of over 5 crore. A survey for the project has already been ordered.The Economic TimesNewKerala.com


2. “Very Soon”—High-Speed Rail Is On the Horizon

CM Naidu emphasized that the bullet train corridor is imminent and highlighted its potential to transform logistics and regional travel. He stressed the project’s readiness to launch once preliminary surveys and approvals are completed.NewKerala.comThe Economic Times


3. Proposed Corridor Structure

The proposed high-speed rail network is set to use elevated corridors, beginning from Hyderabad, passing through Amaravati, and branching toward both Chennai and Bengaluru—offering direct, high-speed connectivity across the region.The Indian ExpressSamayam Telugu


4. Project History & Preparatory Stage

Naidu first floated the idea in October 2024, suggesting that a detailed project report (DPR) would be prepared soon and construction could begin by 2026. The route envisions Hyderabad, Amaravati, Chennai, and Bengaluru as interconnected high-speed hubs.The Times of IndiaThe Indian Express


5. Survey Underway to Shape the Initiative

Building on his earlier proposal, CM Naidu confirmed that official surveys are underway to assess feasibility, alignment, and logistics. These initial steps mark the project’s formal entry into planning.The Economic TimesNewKerala.com


6. Regional Impact and Ambitious Scale

This corridor aims to link South India’s four economic and administrative centers, potentially reshaping regional infrastructure and enabling faster inter-city travel across Telangana, Andhra Pradesh, Karnataka, and Tamil Nadu.Telangana TodayThe Week


7. Alignment With National High-Speed Rail Vision

The corridor complements existing projects like the Chennai–Hyderabad and Hyderabad–Bengaluru high-speed rail lines currently in DPR or planning stages. These additions align with India’s broader Diamond Quadrilateral high-speed rail strategy.Wikipedia+2Wikipedia+2


8. Long-Term Project Timeline

Although no official completion timeframe was announced, based on similar projects, the corridor may take over a decade to finalize—from surveys, approvals, and DPRs, to construction rollout and commissioning.


9. Conclusion: A Transformational Corridor in the Works

CM Naidu’s announcement signals a bold vision to revolutionize Southern India’s transportation infrastructure. Spanning Hyderabad, Amaravati, Chennai, and Bengaluru, this bullet train corridor aims to reduce travel time, enhance connectivity, and promote economic growth across the region.

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
error: Content is protected !!